Price Guarantee....BLOCK paving in North Cyprus

North Cyprus Forums Homepage

Join Cyprus44 Board | Already a member? Login

Popular Posts - List of popular topics discussed on our board.

You must be a member and logged in, to post replies and new topics.

» Cyprus44 North Cyprus Guide (Over 200 Info Pages)

» Book North Cyprus Hotels and Flights



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
21/03/2012 14:13

Join or Login to Reply
Message 1 of 12 in Discussion

Dear Cyprus44 members,

An update to our Block Paving price list as of march the 31st is as follows;



ONE STOP BLOCK PAVING COMPANY IN NORTH CYPRUS,



FROM THE MOMENT A GRAIN OF SAND GOES INTO THE MACHINERY UNTIL IT REACHES TO YOUR HOME AS FINISHED PRODUCT..



BLOCK PAVING OF YOUR DRIVEWAYS, CAR PARKS, DESIGNING YOUR GARDENS, Drainage and other infrastructures for the "Final Approval" of your property is as follows.



PRICES START FROM:



MATERIALS.(BLOCK PAVING STONES)...From 9TL/ m2 grey, 13TL red & 16TL Yellow (delivery 50TL) ex. KDV (MIN PURCHASE 100M2)



PROJECTS: PRICES STARTS FROM 28TL PER SQUARE METER (FINISHED PROJECT)



also, the price for the infrastructure starts from- Rain water drainage (50cm pipes), Street lighting pipes, Telephone lines pipes and 2,4meter block paving pathway- Belediye Approved is 260TL per meter.



FEEL FREE TO CALL 0533 8876333 AND 0542 8876333 FOR FREE & NO OBLIGATION QUOTE..



Check out our facebook.. http://www.facebook.com/blockpa



lippylush


Joined: 29/12/2006
Posts: 197

Message Posted:
21/03/2012 19:20

Join or Login to Reply
Message 2 of 12 in Discussion

Do you do repair work to damaged block paving. We have lifted the paving following water damage but have not got round to re-laying. All the paving is good just needs re-laying properly.



Hippo


Joined: 02/02/2007
Posts: 2070

Message Posted:
21/03/2012 19:43

Join or Login to Reply
Message 3 of 12 in Discussion

I have seen some of the work carried out by this company and it is first class,



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
22/03/2012 12:24

Join or Login to Reply
Message 4 of 12 in Discussion

Hi there lippylush, I love to be able to help...Could would you please send me more info through e mail blackoliveblockpaving@gmail.com

Thanks



gillken


Joined: 25/05/2008
Posts: 521

Message Posted:
22/03/2012 12:39

Join or Login to Reply
Message 5 of 12 in Discussion

When you say "Project Prices" what is included in the price of 28ytl? Does that include hardcore, sand, paving and laying?



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
22/03/2012 13:35

Join or Login to Reply
Message 6 of 12 in Discussion

Hi gillken. Absolutely. When you talk about hardcore though, I understand the "base sand". Any additional filling that require hardcore mechanic filler, JCB work and road roller work will have to be extra. The best thing is to look at the project first. Hope it answered your query. Thanks.



gillken


Joined: 25/05/2008
Posts: 521

Message Posted:
22/03/2012 13:55

Join or Login to Reply
Message 7 of 12 in Discussion

So normally you just lay the paving on the bare earth? Do you think that is stable enough? I note all over TRNC subsidence of pavements/roads due to unstable bases.

In UK we would expect a stable surface of hardcore without question. Yet in TRNC it is not the norm.

Lippylush have had water damage....if they had a hardcore base with appropriate drainage this would not be a problem.

I am not at all saying your finished work does not look good. I am just curious if it would stand the test of time without appropriate hardcore bases.



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
22/03/2012 14:11

Join or Login to Reply
Message 8 of 12 in Discussion

Hello gillken again...Just to clarify to you and other interested parties, here is how it works;

First, we measure the area and give you a quote based on your requirements,

If we agree to go ahead with the project, we clear the area from excess weed and minor rubble, than we lay a base sand approximately 8-10cm thick and compact it. Than we level the sand ready to lay the paving. We lay the stones, fill the gaps and use the compactor to level and secure the paving stones. Sweep off the excess yellow sand and the work is done.



If the ground required additional filling to make it level or straight than we will do the job once we get a go ahead from you. But under no circumstances we lay the stones on the bare earth.

If the ground requires drainage, we shall do that too in order to divert any rainwater to cause our valuable clients any inconvenience.



As I have said earlier, it is best to view the place than we can decide what is needed. Feel free to give me a call on 0533 887 633



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
22/03/2012 14:15

Join or Login to Reply
Message 9 of 12 in Discussion

gillken, tel no 0533 887 6333 and 0542 887 6333



gillken


Joined: 25/05/2008
Posts: 521

Message Posted:
22/03/2012 18:52

Join or Login to Reply
Message 10 of 12 in Discussion

Thank you for clearing that up. It is as I thought. Whilst I do expect you do a terrific visual job. Because the sand is laid directly on the earth I foresee many problems. Especially if no drainage when the rains wash away the sand under the block paver. It does require a stone hardcore base for drainage and stability along with a integrated drainage system for surface water to channel away quickly.



BlockPaving


Joined: 12/03/2012
Posts: 7

Message Posted:
22/03/2012 19:46

Join or Login to Reply
Message 11 of 12 in Discussion

Gillken, I am amazed the knowledge you have on this subject..Yes, we all do those procedures but it is optional. And what that means, it cost extra. But I can assure you that hundreds of projects that we done so far, there was no problem whatsoever.



Rain is known to wash away the sand underneath the block paving stones sometimes, BUT we utilize a special method to avoid that problem. As I said, working on your project while you posses such an accurate knowledge about the job will be fun...Why don't you call us for your project. We would love to undertake it. Regards

Tel no: 0533 887 6333 and 0542 887 6333



gillken


Joined: 25/05/2008
Posts: 521

Message Posted:
22/03/2012 20:13

Join or Login to Reply
Message 12 of 12 in Discussion

Ha I know the local prices....